Achievements

330 kV substation Mogilev commissioning

2021

A festive commissioning of the first Belarussian digital electrical substation (DSS) Mogilev-330, with the rated voltage of 330 kV, took place on the 19 November, 2021. It is an electrical node substation of the Mogilev electric power district. It is also one of the basic substations of the Belarussian Energy System located in the load center and is providing electricity interflow from the Lukoml HPP to the Zhabinka and Gomel electrical nodes
Super-fast charging station for the electrical automobiles

2020

The first Grid integration project of a 350 kW super-fast charging station for the electrical automobiles was implemented in 2020. Two automobiles can be charged there at a time. The charging station is also equipped with a 650 kW-h Li-ion system accumulator of electric power that evens a changeable load schedule.
Li-ion system accumulators of electric power

2020

The first Grid integration project of a 350 kW super-fast charging station for the electrical automobiles was implemented in 2020. Two automobiles can be charged there at a time. The charging station is also equipped with a 650 kW-h Li-ion system accumulator of electric power that evens a changeable load schedule.
Digital substations

2016

The first in Europe, a completely digitalized 330 kV substation Mogilev was designed in 2016 and constructed in 2018. The 110 kV and 330 kV circuit-breakers have been installed at this digital substation. The 110 kV and 330 kV digital (optical) transformers have also been installed there. The 330 kV substation Metallurgicheskaya and the 110 kV substation Yubileinaya have been constructed using the digital technologies.
Elevated support towers

2016

An intermediate and an anchor elevated support towers for the 110 – 330 kV high-voltage power lines had been developed and designed to pass the power line over the forested areas. At the 330 kV power line NPP – Stolbtsy, a 20 km long sector of the power line was designed with the elevated supports. The same was a design for a 12 km long sector of the 330 kV power line NPP – Molodechno.
Modern materials for facade decoration

2014

Civil engineers of the company had developed new design decisions for the 330 kV substation Minsk-Severnaya. The facades decoration of the utility building and the substation control building were suggested to be decorated with the help of the steel sandwich panels, the sub-system of the galvanized siding. Similar design decisions were applied at the substations 110 kV Staroborisovskaya, 330 kV Postavy, and 110 kV Podlesnaya.
WPS – Wind Power Station

2013

Since 2013 a number of Wind power stations have been designed: Grabniki (9 MW), Grodno district; Extension of the Novogrudok WPS (8 MW of additional generating capacity); Asmolovichi WPS (3.4 MW), Mogilev district; Burmaki (50 MW), Minsk district; Luzhische (80 MW), Grodno district.
PPS – Photovoltaic Power Station

2013

A scheme to evacuate power from PPS Gelios (57 MW) was developed in 2013. The project of PPS Asmolovichi (1.6 MW) was completed in 2018.
330 kV and 110 kV Gas-insulated switchgear of the substation

2006

For the first time in Belarus, a gas-insulated switchgear (GIS) was designed for the 110 kV substation Nemiga in 2006. The GIS technology has been successfully applied since at the following facilities: a 110 kV GIS at the 110 kV SS Nemiga, a 110 kV GIS at the 110 kV SS Vesnyanka, a 330 kV GIS at the Belarusskaya NPP, a 110 kV GIS at the 110 kV SS Podlesnaya.
Сable buried laying method

2003

In the designs, the company’s engineers have applied a complex technical method of cable buried laying for the cables of various voltage levels in the confined spaces under the multipath railways, water barriers, and automobile roads of various categories. The design decisions for the supports on the unstable soils there were also developed.

Contacts

220037, Republic of Belarus,

Minsk, 1st Tverdy lane, 5

Contact phone numbers:

+375 17 388-99-00

+375 17 388-99-10 (fax)

E-mail: enproekt@besp.by

Opening hours

Mon-Thu: 830 - 1230 / 1315 - 1730

Fri:      830 - 1230 / 1315 - 1615

Day off: Sat, Sun.

Наш Instagram

©2024, Official site of RUE "Belenergosetproekt"

Search